Further to our posting of 12 February, the 1956-built BG arrived on Friday 16 March from Williton, now with a smart coat of green paint. Fitting out will commence soon so that the carriage can be used to provide an extra 56ft length of museum space.
At the same time as the coach was delivered, the two refurbished WD wagons were taken back to Minehead.
The BG arrives by the platform at Washford.
Shunting the BG.
Moving out the refurbished WD wagons.
WD wagons passing.
Re-making the train with the two wagons included.
Off to Minehead!